Request Infrastructure →

© 2026 Roborns Infrastructure Pvt Ltd

01 / Compute Colocation

Immersive
Cooling.

Direct liquid-immersion GPU clusters starting at 2 MW capacities. Seawater-cooled heat exchanges yield zero carbon thermal reject. Optimized for LLM training and high-density inference.

PUE efficiency1.028
Coolant fluidSynthetic Dielectric (Zonic)
Heat recapture100% (redirected to desalination)
Roborns Immersion-Cooled Compute Floor

Seawater-Cooled Thermal Envelope

Traditional data centers expend up to 40% of their electricity running chillers and evaporative towers. Roborns immersion tanks submerge server nodes in non-conductive dielectric fluid. This fluid absorbs heat directly and circulates through titanium heat exchangers linked to coastal seawater intakes.

By bypassing traditional refrigeration cycles, we operate at a Power Usage Effectiveness (PUE) below 1.03. The thermal reject (leaving the server floor at 65°C) is not dumped into the atmosphere. Instead, it is routed directly to the desalination plant to power multi-effect distillation.

Tier III Reliability

Dual active-active power paths, N+2 backup generation, and redundant seawater feed pipelines guarantee continuous operations.

Extreme Density

Support up to 100 kW per rack. Liquid immersion eliminates hot-spots, reducing silicon thermal stress and degradation by 30%.

Rental EstimatorLIVE COMPUTE

64 GPUs
8 GPUs256 GPUs512 GPUs
Estimated Power Draw65.3 kW
Seawater cooling flow9,795 L/h
♻️ Resource Recovery Loop

This compute cluster generates enough waste heat to desalinate 1,881 Litres of fresh water per day.

Monthly Rental Cost:$92,506/mo
Rate: ~$1.98/gpu/hrAll infrastructure colocation included